This checklist follows a project from the first phone call to the final payment. Each step names the California rule behind it, so you can tell which items are good practice and which are the law. The Contractors State License Board's own short version is its 10 Tips card (CSLB 10 Tips), and this list builds on it.

Step 1: Plan before you call

  • Write down what you want done, with brands, model numbers and finishes where you can. Specific requests make bids comparable.
  • Set a budget. Our California cost guides give price ranges by trade, such as plumbing, roofing and HVAC.
  • Ask your city or county building department whether the work needs a permit. If it does, the person doing it for pay needs a CSLB license at any price (B&P Code ยง7048; permit guide).
  • If your home was built before 1978, plan for lead-safe work practices (lead rules).

Step 2: Find candidates and get at least three bids

Step 3: Verify every license

This takes a few minutes per contractor and carries the most legal weight.

  • Get the license number. Licensed contractors must put it on contracts, bids and ads (ยง7030.5). No number on the bid is a warning sign.
  • Look it up at the CSLB License Check or call 800-321-2752.
  • Active status, matching name. The business on the license should be the business on your contract.
  • The right classification. A multi-trade remodel with structural or new system work needs a B. A B-2 can do cosmetic and fixture remodels of three or more trades. A single-trade job needs that C license (classifications).
  • Bond on file. Every active license needs a $25,000 bond (ยง7071.6).
  • Workers' comp. If a crew of employees will be on site, the license shouldn't show an exemption. Roofers (C-39), concrete (C-8) and HVAC (C-20) contractors must carry it regardless (ยง7125; bond and workers' comp).
  • Complaint disclosures. Read them, and remember the CSLB can disclose only certain complaints (complaint guide).
  • Salesperson registration. If a salesperson sold the job, check their HIS number (it ends in "SP") on the same page (HIS rules).
  • Lead certification for pre-1978 homes. Ask for the firm's EPA RRP certification.

Why it matters: with an unlicensed contractor, there's no license bond, the CSLB can't order repairs, and you may be liable for injuries to the workers (B&P Code ยง7159(e)(5)).

Step 4: Check references and skill

A license shows the contractor met the experience and bond requirements. It doesn't prove the quality of their work.

  • Call recent customers with similar projects
  • Look at finished work in person if you can
  • Ask who will be on site each day, and which parts go to subcontractors

Step 5: Watch for red flags

  • Pressure to sign today, or a "special price" that expires
  • A request for a large deposit, or for cash
  • No license number, or a number that doesn't match the business name
  • A contractor who asks you to pull the permit as an owner-builder
  • Verbal promises about savings or timelines that aren't in the contract
  • A time-and-materials or cost-plus contract for disaster rebuilding, which the CSLB says isn't allowed (CSLB Disaster Help Center)

Step 6: Get the contract in writing

Any home improvement over $500 needs a written contract, signed by both of you before work starts (ยง7159).

  • License number, business address and the salesperson's registration number
  • Contract price in dollars and cents, with any finance charge separate
  • Description of the work and significant materials and equipment
  • Down payment and a schedule of progress payments tied to specific work
  • Approximate start and completion dates
  • Liability insurance and workers' comp notices, the Mechanics Lien Warning, and the CSLB information notice
  • The contractor's email address on the first page for cancellations
  • Whether subcontractors will be used. If yes, ask for the list with license numbers
  • Who pulls and pays for permits

Full list: contract requirements.

Step 7: Know your right to cancel

  • You have 3 business days after receiving the signed contract to cancel, 5 if you're 65 or older, and 7 for repairs after a declared emergency, unless you negotiated the contract at the contractor's place of business (ยง7159(e)(6)โ€“(7)).
  • Keep the detachable Notice of Cancellation form. Details: right to cancel.

Step 8: Pay on a schedule, not up front

  • Down payment no more than $1,000 or 10 percent of the price, whichever is less (ยง7159.5(a)(3)). The only exception is a contractor with a CSLB-approved blanket bond, noted on the license record.
  • No payment that exceeds the value of work done or materials delivered, including advances from your lender (ยง7159.5(a)(5)).
  • Pay by check or card to the business named on the contract. The CSLB says to avoid paying in cash.
  • Keep a job file of every document and payment, as the CSLB recommends.

Step 9: Protect yourself from liens

  • Ask for a list of subcontractors and suppliers and when each starts.
  • Watch for 20-day preliminary notices from them (Civil Code ยง8204).
  • Pay with joint checks to the contractor and any sub or supplier who sent a notice.
  • Ask for a lien release after each payment. You may withhold further payments until you get it (ยง7159.5(a)(6)).

More: mechanics liens.

Step 10: During the project

  • Put every change in a signed change order before the extra work starts. Unsigned changes aren't enforceable against you as change orders (ยง7159(e)(3)).
  • Confirm inspections happen on schedule.
  • Raise problems in writing as soon as you see them.

Step 11: Finishing up

  • Walk through the job with the contractor and make a written punch list.
  • Get the final inspection signed off.
  • Get unconditional lien releases from the contractor and anyone who sent a preliminary notice (Civil Code ยง8138).
  • Make the final payment only when you're satisfied, as the CSLB advises.
  • Consider recording a notice of completion within 15 days of completion, which shortens lien deadlines (Civil Code ยง8182).
  • Keep warranties, manuals, permits and the job file.

If something goes wrong

  1. Write to the contractor describing the problem and what you want done. The CSLB offers a sample letter.
  2. If that fails, file with the CSLB within four years, or 10 years for hidden structural defects (B&P Code ยง7091).
  3. Ask about CSLB mediation and arbitration, the license bond, and small claims court (up to $12,500 for individuals). Details: CSLB complaint process.

Related pages

Sources

Frequently Asked Questions

What should I check before hiring a contractor in California?

Look up the license at the CSLB License Check or call 800-321-2752. Confirm it's active, the classification covers your work, a bond is on file, and workers' comp is on file if the contractor has employees. Read the complaint disclosures, and check the salesperson's HIS registration if someone other than the contractor sold the job.

Should I pay a California contractor in cash?

The CSLB advises against it. Its 10 Tips card says to avoid paying in cash, avoid paying more than 10 percent down or $1,000, whichever is less, avoid letting payments get ahead of the work, and avoid making the final payment until you're satisfied.

How many bids should I get in California?

The CSLB recommends at least three bids, along with checking references. Make sure each bid describes the same work and materials so you can compare them.